Variable Refrigerant Flow (VRF) Projects

Node Electric managed and coordinated with JBS Services for the installation of LON to MS/TP controller, pull and terminate 22/2 LON cable from MS/TP controller to each unit. The installation was completed at four locations:

  • Lakespur Pubic School.
  • Homestead Public School.
  • McCrimmon Public School.
  • David Leeder Public Schools.