Variable Refrigerant Flow (VRF) Projects
Node Electric managed and coordinated with JBS Services for the installation of LON to MS/TP controller, pull and terminate 22/2 LON cable from MS/TP controller to each unit. The installation was completed at four locations:
- Lakespur Pubic School.
- Homestead Public School.
- McCrimmon Public School.
- David Leeder Public Schools.