Barondale PS -Boiler Project.

Remove existing boilers and replace with new high efficiency Viessmann boiler system.

The project consist of:

    • Two Viessmann boilers.
    • Four Danfoss VFD.
    • Two 208V Starters
    • Control panel with two new MPC controllers.